administration student task rubric student work technical quality
 
Incline
Examples of Student Work
Contributed by: RAND

Student #2



The following graph would receive a score of 1 point.


Point for... Points Received
Horizontal Axis: 1
Vertical Axis: 0 (clearly not equal interval)
Plotting all the points: 0 - there is no plot of a "graph point," even though there is a connection of the values on the horizontal and vertical axis
Plotting the points correctly: 0
Total Points 1

Frank and Al wrote down their results in the table below.

Previous Student Work | Next Student Work

 

 


©1997-2005 SRI International. All rights reserved. Terms of Use